No. For this project you are NOT building, repairing, or setting up the Endcap.
Your tasks are to:
- Find the Ryze endcap.
- Verify if it is present.
- Document whether the endcap is fully set.
- Restock product when needed.
- If the endcap is missing:
- Take all required photos to show what endcaps are there
- Ask the manager when it will be installed.
- Ask if Ryze product can be placed in an approved location
- Add product only if you found it in the backroom to ensure its restocked and merchandised.
Do NOT install: Header, Backpanel, Shelf, strips, or Liners
Document manager conversations and any refusals.
Do NOT Install:
- Header
- Backpanel
- Shelf strips
- Shelf liners
- Signage
- Display fixtures
What If Materials Are Missing?
Simply answer the survey questions, letting us know if the materials are present, partially present, or not present at all.
Remember
You are documenting the display and restocking/merchandising IF there is product in the backstock/backroom.